US 7

495/290 Interchange Work Takes A Hit

I drive through this interchange twice a day at least. It sucks (there isn't a nice way to put it, sorry). From 290, there's often a backup onto 495 south, which in turn gets backed up because of the proximity of the onramps from 85 & 290, on an uphill grade, followed shortly by the exit to US 20 west.

Northbound on 495 is no better - too many people who decide at the last minute to suddenly cross 2 lanes of traffic to get onto 290, because they didn't want to wait in the line of slow moving cars on the right.

Improvements to Interstate 495/290 are sidelined - Framingham, MA - The MetroWest Daily News

VT Historic 7A

VT Historic 7A

US 7 Cutout

US 7 Cutout

US 20 and MA 146 Construction

US 20 and MA 146 Construction

US 20 Circle

US 20 Circle

I 84 and US 7 BGS

I 84 and US 7 BGS

I 84 and US 7

I 84 and US 7

US 7 - Ethan Allen Highway

US 7 - Ethan Allen Highway

I 84 and US 7 Square

I 84 and US 7 Square

US 7

US 7

General Routing

CT line in Ashley Falls to VT line in Williamstown via Great Barrinton and Pittsfield.

Upgrades and Multiplexes

Multiplexed with US 20 between Lenox and Pittsfield.
Cosigned with MA 2 in Williamstown.

History

Syndicate content